My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Report
>
CS_Courthouse Square
>
Demolition Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:43:32 PM
Creation date
9/8/2011 9:20:27 AM
Metadata
Fields
Template:
Building
RecordID
10334
Title
Demolition Report
Company
Century West
BLDG Date
6/5/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br />centurywest <br />ENGINEERING CORPORATION <br />Memorandum <br />To: David Hartwig, Marion County <br />Judy Crockett, Marion County <br />Mike Staton, Staton Construction <br />From: Geoff Brown <br />C.C.: Kathleen Thorpe, CWEC <br />Bill Annen, CWEC <br />Subject: Staton Construction Meeting <br />Date: June 30, 1997 <br />The purpose of this memorandum is to memorialize the demolition meeting held on June 26, <br />T997 at the Courthouse Square site. The meeting was a weekly report by Staton on the overall <br />progress and status of the demolition project. <br />The meeting was attended by: <br />Judy Crockett Kathleen Thorpe <br />Loni Richey Geoff Brown <br />Mike Staton Jeff Smith, Three Rivers Environmental <br />The following topics were discussed and are summarized as: <br />1. Demolition is progressing on schedule Demolition of the Lui is complete, Staton will <br />commence demolition of the Goldberg today. Noise levels appear to be decreasin~ at 70 <br />DbA. <br />2. Demolition Rec~ng is exceedin~ planned levels To date, 94% of demolition waste <br />leaving the site has been recycled. The brick giveaway has not yet commenced. <br />3 The well area has been fenced off to maintain site security. Mike said that he does not <br />want the frac-tanks inside the demo fence. <br />4 The greywater tank outside the job trailer is overflowing, Mike said that he would get it: <br />taken care of. <br />5 The City of Salem contacted Staton concerning red runoff going into a nearby creek Mike <br />said that he doubted it was from the site. <br />Century West Engineering appreciates the opportunity to provide this information to you. If <br />you have questions or require additional information, please contact Kathleen Thorpe at <br />(503)540-0995. <br />~ E a ~ i N ~ r H R o o ~ H E F F E c r i v E s o~_ u r i o r~ s <br />1593 Clay Street NE Salem, Oregon 97301 Phone: (503) 540-0995 FAX: (503) 589-1657 <br />
The URL can be used to link to this page
Your browser does not support the video tag.