My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Report
>
CS_Courthouse Square
>
Demolition Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:43:32 PM
Creation date
9/8/2011 9:20:27 AM
Metadata
Fields
Template:
Building
RecordID
10334
Title
Demolition Report
Company
Century West
BLDG Date
6/5/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
required. The contractor shall notify the Owner or Owners Representative 24 hours in <br />advance of the time that test services are needed to allow adequate scheduling of <br />equipment and personnel. <br />B. If the contractor fails to meet final clearance standards, the contractor shall reclean the <br />work area to meet such standards. Costs incurred by the Owner or Owners <br />Representative for retesting of final clearances shall be deducted from the sums <br />originally due the contractor. <br />Basement Removal <br />A. Perform excavation work in a systematic manner as necessary to safely and completely <br />demolish and remove basements and basement walls including appurtenances related <br />to and connected thereto. <br />B. Debris, including masonry, concrete, metals and similar materials shall become <br />property of contractor and shall be disposed of offthe site by the contractor. To the <br />practical extent, provide for separate sorting of demolition debris for recycling and <br />resource recovery. <br />C. Shoring, Sheeting and Bracing: Maintain angles of repose for banks and excavations <br />over five feet deep to protect workers. Extend shoring and bracing to the bottom of <br />the excavation. Shoring slope angles shall be in compliance with applicable Oregon <br />Safety and Health Administration (OSHA) standards. <br />D. Any petroleum impacted soil encountered during excavation shall be stockpiled on- <br />site. Stockpiles shall be line, bermed and covered to prevent infiltration of water. <br />E. Cleanup: Upon completion of this section, and after removal of all debris, leave site in <br />clean condition satisfactory to the Owner or the Owner's Representative. Dispose of <br />all items and materials not required to remain property of Marion County as well as all <br />debris and rubbish from demolition operations. <br />F. Upon completion of this section, contractor shall smooth or grade all ground surfaces <br />where applicable. <br />Recycling <br />A. Recycling levels shall be maintained at 90%. <br />The Basement And Shoring Removal was performed during the months of August and <br />September, and Staton Construction was off site September 25`~, 1998 as per the schedule. <br />Staton Construction removed and properly disposed or recycled all debris associated with the <br />removal of the basement shoring fill, basement walls, basement floors and basement footings. <br />Demolition Management Page 13 C~l'F,C 6/4'98 <br />Courthouse Square Project 40806-001-22 <br />Marion County <br />
The URL can be used to link to this page
Your browser does not support the video tag.