My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Report
>
CS_Courthouse Square
>
Demolition Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:43:32 PM
Creation date
9/8/2011 9:20:27 AM
Metadata
Fields
Template:
Building
RecordID
10334
Title
Demolition Report
Company
Century West
BLDG Date
6/5/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br />centurywest <br />ENGINEERING CORPORATION <br />Memorandum <br />To: David Hartwig, Marion County <br />Judy Crockett, Marion County <br />Mike Staton, Staton Consnuction <br />Subject: Staton Weekly Consn~uction <br />Meeting <br />From: Geoff Brown <br />C.C.: Kathleen Thorpe, CWEC <br />Bill Annen, PE, CWEC <br />Date: July 31, 1997 <br />The purpose of this memorandum is to memorialize the demolition meeting held on July 31, 1997 at <br />the Courthouse Square site. The meeting was a weekly report by Staton on the overall progress and <br />status of the demolition project. <br />The meeting was attended by: <br />David Hartwig Kathleen Thorpe <br />~ Mike Staton Geoff Brown <br />Loni Richey <br />The following topics were discussed and are summarized as: <br />1. Demolition is progressin~ four days behind schedule. The Senator will be complete by the end of <br />next week. Work is slowing down, Staton had prior commitments and personnel is dwindling. <br />2. Demolition Rec~g is proceedin~ at planned levels. Demolition recycling is probably up around <br />90%. Staton is having some problems with the wood waste. The dump is still accepting it, but they <br />do not know what they will do with it; they have no buyer. <br />3. Chevron will be out on the site next week to dismantle their onsite treatment system. Katie <br />Robinson with Pacific Environmental Group will be coordinating their efforts. The system will be <br />out by the 15"' <br />Century West Engineering appreciates the opportunity to provide this information to you. If you have <br />questions or require additional information, please contact Kathleen Thorpe at (503)540-0995. <br />L E A D I N G T H R O U G H E F F E C T I V E ~ O L'J T I O N S <br />1593 Clay Street NE Salem, Oregon 97301 Phone: (503) 540-0995 FAX: (503) 589-1657 <br />
The URL can be used to link to this page
Your browser does not support the video tag.