disturbed soil surfaces shall be protected from erosion with a 2-inch blanket of 3/4-inch minus crushed rock <br /> and/or re-seeded with a locally adapted mixture of annual and perennial grasses.It is anticipated that any <br /> excess soil from tank excavations will remain on Site. <br /> Close attention to grades and relative elevations is critical to ensure adequate fall where gravity <br /> flow is required. <br /> The term"compacted"is used in several places in the plans and specifications.The intent of this term is to <br /> reduce the potential for settling in or near the affected area after system components are in place.Any <br /> measurable settling,and any damage caused by said settling,that occurs within one year after construction <br /> is completed,shall be repaired promptly by the Installer at no cost to the Owner. <br /> 5.2 Piping and Plumbing <br /> Materials <br /> The following materials,or considered equivalent, are approved for the purposes of this project: <br /> • Building Sewer(Drainage System)Pipe and Fittings-Type PSM(PVC),ASTM D-3034 or <br /> Schedule 40 PVC or ABS DWV,as specified on the plans. <br /> • Effluent Sewer Pipe and Fittings-Either type ASTM D-3034, Schedule 40 or PSM PVC or <br /> ABS DWV,as specified on the plans. <br /> • Pressure Pipe and Fittings-Either Schedule 40 or Class 200 PVC 1120(ASTM D-2241)or <br /> High Density Polyethylene(HDPE)SDR 11,as specified on the plans. <br /> Workmanship <br /> All building sewers,effluent sewers,and force mains shall be placed on a uniformly graded,stable base of <br /> either undisturbed soil,selected soil backfill,or other specified granular material. Each pipe shall be <br /> uniformly supported along its entire length to control settling and stresses during and following backfill. <br /> Unless authorized by the Designer,thrust blocks shall be installed anywhere a force main makes a bend <br /> greater than 45 degrees.Pipe markings shall be oriented at 12 o'clock to allow ready inspection after <br /> installation,prior to backfill.All gravity building sewers,gravity effluent sewers,pressure effluent sewers, <br /> and manifold piping to each distribution box shall be marked with tracer wire for future reference. <br /> The building sewer shall be laid at a uniform grade no less than 1/4-inch fall per foot of run(%s-inch where <br /> specifically noted)and shall be watertight.The Installer shall be responsible for obtaining plumbing <br /> permits and inspections from the appropriate local building department,as necessary. Gravity effluent <br /> sewers shall be laid at a uniform grade no less than 4 inches per 100 feet unless specifically called out on <br /> the drawings.A minimum of 12 inches of cover shall be provided over horizontal gravity piping after <br /> backfill(settled)in areas not subject to vehicular traffic.A minimum of 30 inches of cover shall be <br /> provided over horizontal pressure piping after backfill(settled) and in areas subject to traffic,unless <br /> sleeved in a protective steel sleeve or other approved protection.In such cases,all bedding and backfill <br /> shall bei-inch minus crushed rock.An air release/vacuum breaker must be installed at each high point <br /> along the force main if it cannot be laid at a continuous level to uphill grade.Backfill within trenches <br /> under asphalt shall be compacted prior to repaving to prevent subsequent settling. <br /> All gravity and pressure effluent piping shall be watertight.Gravity effluent sewer piping shall be tested <br /> with a minimum of 15 feet of static water pressure.The test will be considered acceptable if no <br /> CES -Albany,OR St.Innocent Winery and Tasting Room I P&S <br /> Doc:2018240028 St.Innocent Winery Plans&Specs May 2018 I Page 3 <br />