My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8576246
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
18-XXXXXX
>
8576246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2019 8:49:46 AM
Creation date
4/3/2019 10:57:45 AM
Metadata
Fields
Template:
Permits
Permit Address
10052 ENCHANTED WAY SE
Permit City
JEFFERSON
Permit Number
555-18-003782-PRMT
Parcel Number
093W02 00500
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Backfilling shall not take place until the Inspector has inspected and approved each trench.Backfilling <br /> shall be done in a manner that minimizes compaction.Native soil removed during excavation of the <br /> trenches shall be used for backfill.Each trench shall be overfilled(mounded about three inches), as shown <br /> on the plans,to allow for natural settling. <br /> 6.0 INSPECTIONS <br /> 6.1 Pre-Construction Conference <br /> The pre-construction conference provides an opportunity for all parties involved to discuss the proposed <br /> activities(on-site).The location and routing of the various components will be reviewed and discussed at <br /> ` this time.Construction should be scheduled to begin as soon as possible following these activities. <br /> Attendance by representatives of the following entities is recommended: <br /> • St.Innocent Winery(Owner) <br /> • Installation Contractor(Installer) <br /> • Cascade Earth Sciences(Designer/Inspector) <br /> 6.2 Construction Inspections <br /> The following table provides a summary of inspections.The Designer is responsible for certifying that the <br /> [ system was installed in accordance with the approved plans and specifications. The Installer shall <br /> maintain close contact with the Designer to provide adequate notice(minimum 24 hours)for timely scheduling of inspections.Consolidation of inspections should occur to the fullest extent practicable. <br /> Table 1.Inspection Schedule • <br /> Inspector <br /> Inspection . <br /> Designer Marion County <br /> 1. Tanks—Placement and Water Tightness M <br /> 1 O <br /> Testing <br /> 2. Gravity and Pressure Effluent Sewer— O <br /> Placement and Water Tightness Testing <br /> 3. Drainfield—Placement,Grades,Piping, O M <br /> i Plumbing, and Pre-Cover <br /> It <br /> 4. Pumps, Blowers, and Controls—Installation O M <br /> and Function <br /> 5. Final Inspection/System Start-up M M <br /> Notes: M=Mandatory <br /> O=Optional <br /> I I ' <br /> CES-Albany,OR St.Innocent Winery and Tasting Room I P&S <br /> 8 Doc:2018240028 St.Innocent Winery Plans&Specs May 2018 I Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.