Laserfiche WebLink
Septic Permit 555-18-008977-PRMT Page 4 of 4 <br /> Date CerttficateIssue 06/05/2019 .' - <br /> Work'Description z AUTH MAJALT REPL 3 BDRM SFIJ WITH 3 BDRM SFD NEW SYSTEM <br /> future repair system must both be protected. <br /> MAINTAIN PERMANENT ACCESS to septic tank for pumping and service. The septic tank should be pumped <br /> and inspected by a licensed septic tank pumping service before sludge and scum accumulations reach 30%of <br /> the tank liquid operating volume. Pumping every 3 to 5 years is an average interval. The septic tank is a <br /> reservoir for the solid materials in the sewage waste stream. Excessive accumulation of these solid materials in <br /> the septic tank will cause the solids to wash out of the tank and into the drainfield. This will cause irreversible <br /> damage to the drainfield and will eventually lead to a system failure. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely <br /> affect the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic,livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the <br /> issuance of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply, including <br /> payment of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> Certificate lof Satisfactory Completion :` <br /> System Inspection: No Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No <br /> Comments: N/A <br /> Completed Inspections <br /> Inspector Inspection Inspection Date Inspection Result <br /> Claudia Hill 7999 Final Septic 06/05/2019 Approved <br /> Claudia Hill 7100 Septic Tank 06/05/2019 Approved <br /> Claudia Hill 7020 Pre-cover 05/21/2019 Approved <br /> Claudia Hill 7100 Septic Tank 05/21/2019 Denied <br /> Claudia Hill Onsite Inspector <br /> CALL BEFORE YOU DIG...IT'S THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center.Those rules are set forth by Oregon Administration Rules. You may obtain copies <br /> of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 6/5/19:3:56:29PM Page 4 of 4 ONS_OnsiteCSC pr <br />