Laserfiche WebLink
installations are available in our office. The electrical wiring to the pump and alarm must be installed in <br /> accordance with the appropriate Electrical Code. The electrical work must be done under a Marion <br /> County Electrical Permit and must be inspected and approved by a Marion County Electrical Inspector. <br /> The work must be left uncovered and accessible for inspection. The electrical inspection includes the <br /> connections to the pump and alarm in the dosing tank, the wiring in the trench and the connections in the <br /> structure. <br /> DO NOT INSTALL SYSTEM DURING WINTER MONTHS(Nov. 1 —March 1) <br /> The geographical area in which the property lies is considered a risk to installation during winter <br /> months. Therefore, for this installation a Marion County Onsite Wastewater Specialist must specifically <br /> approve this site for installation from November 1" to March 161. This may include a field visit directly <br /> prior to installation. <br /> THE ATTACHED SEPTIC TANK ABANDONMENT FORM MUST BE COMPLETED AND <br /> RETURNED TO OUR OFFICE. The septic system installer must complete and sign the form and attach <br /> a copy of the receipt from the septic tank pumping service for pumping the tank. <br /> OBSERVE ALL SETBACKS AND SEPARATION DISTANCES as required by the DEQ rules. <br /> Drainfield lines require a separation of at least 10 feet from existing drainfield lines. A copy of the DEQ <br /> setback requirements is included for your review. <br /> THE APPROVED SEPTIC SYSTEM AREA MUST BE PROTECTED from any vehicular traffic, <br /> livestock and farming activities. Other activities such as excavating or filling, driveway placement, <br /> paving or other similar activities that alter the natural soil conditions will adversely affect the soil and <br /> the septic system function and lead to premature system failure. The area must not be subjected to <br /> excessive saturation due to artificial drainage of ground surfaces, driveways, building downspouts or <br /> other sources. The areas of the initial septic system and the future repair system must both be protected. <br /> THIS SYSTEM MUST BE INSPECTED AND APPROVED PRIOR TO BACKFILL. When work <br /> is complete and ready for inspection, request an inspection by following the instructions on the <br /> accompanying permit document. Be sure the System Record form with the As-Built drawing is on the <br /> job or in our office when the inspection is requested. An inspection should be completed within seven <br /> (7) days. <br /> 5155 Silverton Road NE—P.O.Box 14500—Salem.Oregon 97309-5036—Phone(503)588-5147—Fax(503)588-7948 <br /> Page 2 oft <br />