Laserfiche WebLink
Detroit Dam. and Reservoir Minto Fish Collection Facility Rebuild <br /> (a) The top (crown) of the sanitary pining shall be at least <br /> 18 inches below the bottom (invert) of the water main. <br /> (b) Where this vertical separation cannot be obtained, the <br /> iron water pipe pressure tested in place without leakage prior <br /> to backfilling. <br /> (c) The sewer manhole or boxes shall be of watertight <br /> construction and tested in place. <br /> b. Installation of sanitary piping crossing a water line: <br /> (1) Normal conditions: Lay sanitary sewer piping by crossing <br /> under water lines to provide a separation of at least 18 inches <br /> between the top of the sanitary piping and the bottom of the water <br /> line whenever possible. <br /> (2) Unusual conditions: When local conditions prevent a vertical <br /> separation described above, use the following construction: <br /> (a) Sanitary piping passing over or under water lines shall be <br /> constructed of AWWA-approved ductile iron water pipe, pressure <br /> tested in place without leakage prior to backfilling. <br /> (b) Sanitary piping passing over water lines shall, in <br /> addition, be protected by providing: <br /> (1) A vertical separation of at least 18 inches between the <br /> bottom of the sanitary piping and the top of the water line. <br /> (2) Adequate structural support for the sanitary piping to <br /> prevent excessive deflection of the joints and the settling <br /> on and breaking of the water line. <br /> (3) That the length, minimum 20 feet, of the sanitary <br /> piping be centered at the point of the crossing so that <br /> joints shall be equidistant and as far as possible from the <br /> water line. <br /> c. Sanitary sewer tanks: No water piping shall pass through or come <br /> in contact with any part of a sanitary sewer tank. <br /> d. Where sanitary piping crosses existing culverts, the piping shall <br /> pass over or under the culverts without disturbance to the culverts. <br /> Where the piping crosses over culverts, adequate structural support <br /> shall be provided to prevent excessive settlement and deflection of <br /> piping. <br /> 3.1.1.2 Pipe Laying and Jointing <br /> Inspect each pipe and fitting before and after installation; replace those <br /> found defective and remove from site. Provide proper facilities for <br /> lowering sections of pipe into trenches. Lay nonpressure pipe with the <br /> bell ends in the upgrade direction. Adjust spigots in bells to give a <br /> uniform space all around. Blocking or wedging between bells and spigots <br /> will not be permitted. Replace by one of the proper dimensions, pipe or <br /> fittings that do not allow sufficient space for installation of joint <br /> material. At the end of each work day, close open ends of pipe temporarily <br /> 33 30 00. 00 25-9 <br />