My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9084344
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
12-XXXXX
>
9084344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 11:55:21 AM
Creation date
1/3/2020 2:38:40 PM
Metadata
Fields
Template:
Permits
Permit Address
34939 NORTH SANTIAM HY SE
Permit City
GATES
Permit Number
555-12-06306
Parcel Number
094E29 00600
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Detroit Dam. and Reservoir Minto Fish Collection Facility Rebuild <br /> (a) The top (crown) of the sanitary pining shall be at least <br /> 18 inches below the bottom (invert) of the water main. <br /> (b) Where this vertical separation cannot be obtained, the <br /> iron water pipe pressure tested in place without leakage prior <br /> to backfilling. <br /> (c) The sewer manhole or boxes shall be of watertight <br /> construction and tested in place. <br /> b. Installation of sanitary piping crossing a water line: <br /> (1) Normal conditions: Lay sanitary sewer piping by crossing <br /> under water lines to provide a separation of at least 18 inches <br /> between the top of the sanitary piping and the bottom of the water <br /> line whenever possible. <br /> (2) Unusual conditions: When local conditions prevent a vertical <br /> separation described above, use the following construction: <br /> (a) Sanitary piping passing over or under water lines shall be <br /> constructed of AWWA-approved ductile iron water pipe, pressure <br /> tested in place without leakage prior to backfilling. <br /> (b) Sanitary piping passing over water lines shall, in <br /> addition, be protected by providing: <br /> (1) A vertical separation of at least 18 inches between the <br /> bottom of the sanitary piping and the top of the water line. <br /> (2) Adequate structural support for the sanitary piping to <br /> prevent excessive deflection of the joints and the settling <br /> on and breaking of the water line. <br /> (3) That the length, minimum 20 feet, of the sanitary <br /> piping be centered at the point of the crossing so that <br /> joints shall be equidistant and as far as possible from the <br /> water line. <br /> c. Sanitary sewer tanks: No water piping shall pass through or come <br /> in contact with any part of a sanitary sewer tank. <br /> d. Where sanitary piping crosses existing culverts, the piping shall <br /> pass over or under the culverts without disturbance to the culverts. <br /> Where the piping crosses over culverts, adequate structural support <br /> shall be provided to prevent excessive settlement and deflection of <br /> piping. <br /> 3.1.1.2 Pipe Laying and Jointing <br /> Inspect each pipe and fitting before and after installation; replace those <br /> found defective and remove from site. Provide proper facilities for <br /> lowering sections of pipe into trenches. Lay nonpressure pipe with the <br /> bell ends in the upgrade direction. Adjust spigots in bells to give a <br /> uniform space all around. Blocking or wedging between bells and spigots <br /> will not be permitted. Replace by one of the proper dimensions, pipe or <br /> fittings that do not allow sufficient space for installation of joint <br /> material. At the end of each work day, close open ends of pipe temporarily <br /> 33 30 00. 00 25-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.