My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9084344
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
12-XXXXX
>
9084344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 11:55:21 AM
Creation date
1/3/2020 2:38:40 PM
Metadata
Fields
Template:
Permits
Permit Address
34939 NORTH SANTIAM HY SE
Permit City
GATES
Permit Number
555-12-06306
Parcel Number
094E29 00600
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Detroit Dam. and Reservoir Minto Fish Collection Facility Rebuild <br /> (1) Clay pipelines: Test in accordance uith ASTM C 828. <br /> Allowable pressure drop shall be as given in ASTM C 828. Make <br /> calculations in accordance with the Appendix to ASTM C 828. <br /> (2) Concrete pipelines: Test in accordance with ASTM C 924. <br /> Allowable pressure drop shall be as given in ASTM C 924. Make <br /> calculations in accordance with the Appendix to ASTM C 924. <br /> (3) Ductile-iron pipelines: Test in accordance with the <br /> applicable requirements of ASTM C 924. AlLowable pressure drop <br /> shall be as given in ASTM C 924. Make calculations in accordance <br /> with the Appendix to ASTM C 924. <br /> (4) ABS composite plastic pipelines: Test in accordance with the <br /> applicable requirements of UBPPA UMI-B-6. Allowable pressure drop <br /> shall be as given in UBPPA UNI-B-6. Make calculations in <br /> accordance with the Appendix to UBPPA UNI-8-6. <br /> (5) PVC plastic pipelines: Test in accordance with UBPPA DNI-B-6. <br /> Allowable pressure drop shall be as given in UBPPA UNI-B-6. Make <br /> calculations in accordance with the Appendix to UBPPA UNI-B-6. <br /> 3.2.2.2 Deflection Testing <br /> Perform a deflection test on entire length of installed plastic pipeline on <br /> completion of work adjacent to and over the pipeline, including leakage <br /> tests, backfilling, placement of fill, grading, paving, concreting, and any <br /> other superimposed loads determined in accordance with ASTM D 2412. <br /> Deflection of pipe in the installed pipeline under external loads shall not <br /> exceed 4.5 percent of the average inside diameter of pipe. Determine <br /> whether the allowable deflection has been exceeded by use of a pull-through <br /> device or a deflection measuring device. <br /> a. Pull-through device: This device shall be a spherical, spheroidal, <br /> or elliptical ball, a cylinder, or circular sections fused to a common <br /> shaft. Circular sections shall be so spaced on the shaft that distance <br /> from external faces of front and back sections will equal or exceed <br /> diameter of the circular section. Pull-through device may also be of a <br /> design promulgated by the Uni-Bell Plastic Pipe Association, provided <br /> the device meets the applicable requirements specified in this <br /> paragraph, including those for diameter of the device, and that the <br /> mandrel has a minimum of 9 arms. Ball, cylinder, or circular sections <br /> shall conform to the following: <br /> (1) A diameter, or minor diameter as applicable, of 95 percent of <br /> the average inside diameter of the pipe; tolerance of plus 0.5 <br /> percent will be permitted. <br /> (2) Homogeneous material throughout, shall have a density greater <br /> than 1.0 as related to water at 39.2 degrees F, and shall have a <br /> surface Brinell hardness of not lees than 150. <br /> (3) Center bored and through-bolted with a 1/4-inch minimum <br /> diameter steel shaft having a yield strength of not less than <br /> 70,000 psi, with eyes or loops at each end for attaching pulling <br /> cables. <br /> (4) Each eye or loop shall be suitably backed with a flange or <br /> heavy washer such that a pull exerted on opposite end of shaft <br /> 33 30 00. 00 25-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.