My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11991311
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
21-XXXXXX
>
11991311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 12:32:19 PM
Creation date
12/26/2023 2:22:10 PM
Metadata
Fields
Template:
Permits
Permit Address
5915 WINDSOR ISLAND RD N
Permit City
Keizer
Permit Number
555-21-000812-ELEC
Parcel Number
063W33 00200
Permit Type
Electrical
Extra Information
2021 Master Permit
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
007 MJN 8/1/20 00716BDW4 KEIZER FIRE DISTRICT INSPECTIONS REVEALED THE <br /> FOLLOWING VIOLATION.605.5 EXTENSION CORDS: <br /> DISCONTINUE USE OF EXTENSION CORDS THAT IS <br /> CONNECTED INTO CONEX BOX WITH MULTI PLUG <br /> ADAPTOR OR AND EXTENSION CORD PLUGGED INTO IT. <br /> • unauthorized power wiring has been removed from contractor owned <br /> conex <br /> 010 N DIGESTER COMPLEX <br /> ITEM BY C-DATE W/O# <br /> 010 EC 1/16/20 91202EC01 REPLACE ALL T8 LAMPS IN BUILDING WITH BYPASS THE <br /> BALLAST LED REPLACEMENT LAMPS.---rewired and relamped <br /> light fixtures with LED lamps <br /> 010 EC 4/9/20 00402DJHI THE LIGHT ABOVE THE OVERFLOW BOX ON NPD#1 IS <br /> OUT.---Replaced lamp and tested photocell <br /> 010 EC 7/24/20 00723MJN1 PHOTO CELL SEEMS TO HAVE FAILED. LIGHT IS ON ALL <br /> THE TIME.---Replaced and tested photcell <br /> 010 MJN 6/8/20 CIPRIO010 INSTALLATION OF NEW DCS RIO CABINET IN THE NORTH <br /> DIGESTER FACILITY. INCORPORATE FIBER FROM THE <br /> FLOT THICKENER TO THE NORTH DIGESTER <br /> FACILITY...Work completed by NSE <br /> 010 MJN 11/16/20 60301BDW2 INSTALLATION OF NEW DCS RIO CABINET IN THEN DIG <br /> BLDG. CREATE A FIBER PATH FROM N DIG TO FLOT...Work <br /> completed by NSE <br /> AI-1002 PJS 12/24/20 01116PJSl FYRITE IS LOW ON FLUID.ALSO FIND AUTHORIZED <br /> SUPPLIER OF FYRITE SPARE PARTS. Filled[RBL]. Fyrite 60% <br /> CO2 is now obsolete according to Bacharach HQ. Looking for <br /> II/ substitute instrument since parts other than the fluid are not available. <br /> [PJS]. <br /> LI-114 PJS 9/23/20 00919SRA1 INDICATOR IS READING INCONSISTENTLY.VALUE FOR <br /> LEVEL CHANGES FOR NO REASON. Purged bubbler. 138" <br /> before, 142"after. <br /> TT-121 PJS 7/30/20 00728DER1 NPD#1 TEMP. PROBE HAS NOT MOVED FROM 100.0 DEG F <br /> FOR 2 DAYS.THE HOT WATER VALVE ON THE HEAT <br /> EXCHANGER IS CLOSED.Transmitter would lock-up it's output, <br /> even if probe wires were removed.Only way to reset was to cycle <br /> power on transmitter. Replaced INOR IPAQ-Hplus transmitter, <br /> configured,calibrated,and ordered another spare. <br /> VFDOIODS01 EC 3/10/20 00306EC01 COOLING FAN#3 NEEDS REPLACING. BEARINGS ARE VERY <br /> NOISY---Replaced cooling fan <br /> 011 CENTRIFUGE <br /> ITEM BY C-DATE W/O# <br /> 011 EC 6/5/20 00511GCP3 RUN CONDUIT AND WIRE UP CONVEYOR#3 AFTER <br /> MECHANICS REINSTALL CONVEYOR.----Completed <br /> 011 EC 6/5/20 00527MJN 1 INSTALL A MOTOR RATED MANUAL STARTER ON <br /> CONVEYOR#3 SO TRUCK DRIVERS CAN TURN OFF <br /> CONVEYOR WHILE SWAPPING TRUCKS---Installed new <br /> disconnect switch and tested. <br /> 011 MJN 8/25/20 00819GCP4 PROVIDE TEMPORARY FEED FROM GRINDER POWER TO <br /> • TEMPORARY MUFFIN MONSTER WHILE CENTRIFUGE <br /> GRINDER IS BEING REPAIRED.---Wired in temporary grinder and <br /> installed correct motor protection circuit breaker <br /> Page 7 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.