My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12987539
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
17-XXXXXX
>
12987539
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 8:00:12 PM
Creation date
7/30/2025 4:41:38 PM
Metadata
Fields
Template:
Permits
Permit Address
13773 SILVER FALLS HWY SE
Permit City
Sublimity
Permit Number
555-17-005840-STR
Parcel Number
081W14 00600
Permit Type
Structural
Extra Information
Alternate Material(s) and/or Method(s)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> TFP370 <br /> Page 11 of 12 <br /> Releasing Panel Model ORS Electronic Accelerator(Ref. It is highly recommended that imple- <br /> 11110 Potter Electric Series Table D,Nominal Pressure column). mentation of the design features be <br /> PFC-4410-RC Releasing Panel utilizes During the system set-up acceptance performed through the coordination of <br /> a NEMA Type 1 enclosure(i.e.,general the architect/engineer,owner,authority <br /> purpose enclosure). Therefore the tests, a calibrated pressure gauge having jurisdiction, mechanical <br /> panel must be located where it will not should be used to set the system air designer,and fire protection designer. <br /> be subject to direct or indirect wetting pressure that had been entered into the <br /> (e.g.,condensation). Program. <br /> FDT-Q Fluid Delivery Calculation An engineering evaluation should be <br /> Progr After the proper air pressure performed based upon the specific <br /> Fire Detection has been established, use the call- penthouse and storage arrangement <br /> For preaction systems,135°F(57°C)or brated gauge to determine the standard to determine the preferred method of <br /> 155°F(68*C) rated LHD wire must be air pressure gauge deviation(d any)and protection including consideration of <br /> installed. note the calibration deviation between the following: <br /> the calibrated gauge and the standard • quantity and class of material stored <br /> The LHD may be run along the branch- <br /> lines or perpendicular to the branch- gauge for future reference. below penthouse <br /> lines.The following requirements shall Mechanical System Shut-Down • area of openings between storage <br /> apply when installing LHD. The fire detection system must be space and penthouse <br /> If along branchlines: designed to shut fans down in powered range• arrangement of air distribution <br /> ventilation systems or to close dampers • <br /> duct-work <br /> • on branchline piping in natural ventilation systems upon <br /> • along branchlines (i.e., parallel to actuation.The system is to be designed To ensure the proper operation of the <br /> but not directly attached to branch- to shut down fans to avert delayed fire sprinkler system in this area,the <br /> lines)provided LHD is no further than operation of the first sprinklers. following design features should be <br /> 12 inches (305 mm) laterally from A separately ordered Auxiliary Relay included whenever possible: <br /> branchlines Module Potter MR-201/C for the Potter • Minimize openings between the <br /> If perpendicular to branchlines: Electric Series PFC-4410-RC Releasing storage space and the penthouse <br /> Panel must be utilized to perform this to the minimum area necessary to <br /> • LHD must be spaced no further function. pro-vide makeup air for the chillers. <br /> than maximum spacing between AuxiliaryRelayModules are available <br /> branchlines • Minimize total penthouse volume. <br /> for mounting either inside or outside <br /> • LHD must cross within 12 inches(305 of the Series PFC-4410-RC Releasing • Install sub-ceiling beneath open <br /> mm)laterally of sprinklers Panel. For QUELL Systems, only use areas with Ultra K17 Sprinklers <br /> �, The fire detection zone must match the externally located Auxiliary Relay installed below.Sub-ceiling should <br /> the sprinkler system area.Overlapping Module to avoid electrical interfer- be provided in accordance with FM <br /> pac g ence with the wiring connections to Sheet gApprovals' Loss Prevention Data <br /> of the fire detection zone to adjacent Sheet 2-0,Paragraph 2.2.1.8(a). <br /> sprinkler system areas is not permitted. the Model ORS Electronic Accelerator. <br /> Using an externally located Auxiliary • Install draft curtains around the <br /> All other LHD manufacturers installation Relay Module will also maximize on perimeter of the penthouse open- <br /> instructions and hanging methods must battery space within the PFC-4410-RC. ings. <br /> be followed. <br /> Fire Pump Start-Up • Eliminate storage beneath mechan- <br /> Fire Detection Circuit To ensure that the lull hydraulic ical penthouses. <br /> The fire detection circuit illustrated in capacity is available for system filling, <br /> Figure 2 is shown as Class B. Class A fire pump start-up is recommended to Operation <br /> detection circuit may be utilized when be initiated upon actuation of the fire <br /> installed per Potter Manual 85403550, detection system. Double Interlock Preaction System <br /> Rev L or greater,describing the Potter A separately ordered Auxiliary Relay When the system is set for service, <br /> Electric Secriesies PFC-4410-RC Releasing Module Potter MR-201/C for the Potter the system piping is pressurized with <br /> Panel. Electric Series PFC-4410-RC Releasing a dry source of air, and the releasing <br /> Battery Back-Up Panel must be utilized to perform this panel is in a normal standby condition. <br /> TFPP recommends a minimum of 90 function. In the event of a fire,the fire detection <br /> hours of battery backup for the QUELL Auxiliary Relay Modules are available will respond(15�F(fib maximum)to <br /> design methodology. To achieve this initiate Zoned of the releasing panel.As <br /> with the Potter PFC4410 RC panel,18 for mounting either inside or outside the fire continues to grow,the opening <br /> with hear batteries are provided with of the Series PFC-4410-RC Releasing of one or more Ultra K17 sprinklers <br /> amp the panel package. If the AHJ and/or Panel. For QUELL Systems, only use (266°F(141°C))will begin to relieve air <br /> end user will accept less than 90 hours the externally located Auxiliary Relay pressurerefrom the system piping. The <br /> Module to avoid electrical interior- Model ORS Electronic Accelerator will <br /> of battery backup (e.g., 24 hours), ante with the wiring connections to respond to an air decayrate of at least <br /> other batteries may be ordered. In all the Model ORS Electronic Accelerator. p <br /> cases, battery calculations must be 0.10 es2soc releasing07 bar/sec)p to initiate. <br /> performed.A Battery Calculation form Using a Moduleeuernally located Auxilianry Zone 2 of and the i , panel. With <br /> Relay awithini also maximize C. Zones will r initiated, the releasing circuit <br /> can be accessed on the Potter web site battery space the PFC-A410-RC. panel energize the circus <br /> at: <br /> hit //www. ottersi nal.com/fire/ Penthouse to the solenoid valve in the DV-5 Deluge <br /> batt ger toolsP h Penthouse configurations vary consid- Valve trim.Opening the solenoid valve <br /> y p p erably,and as such there is no universal trips the DV-5 allowing water to enter <br /> Automatic Air Supply solution for providing protection the system piping and flow to the <br /> The normal system air pressure can beneath these areas. activated sprinkler(s). <br /> be at any pressure compatible to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.