Laserfiche WebLink
Application Instructions For Backstop NT For Use Beneath Claddings Other Than Dryvit EIFS DS300 <br /> 2. Continuity of the air barrier <br /> a. The Backstop NT membrane must be connected at the following locations in order to provide continuity: <br /> 1)Air barrier for the roof and foundation <br /> 2)To concrete below grade structures <br /> 3)To windows and doors <br /> 4) Louvers and other mechanical equipment <br /> 5) Electrical boxes <br /> 6) Hose bibs <br /> 7) Any other wall penetrations <br /> b. Provide a bead of compatible sealant complying with ASTM C 920 between the Backstop NT <br /> membrane, AquaFlash or Flashing Tape and the adjacent material. <br /> DISCLAIMER <br /> Information contained in these application instructions conforms to standard detail and product <br /> recommendations for the installation of the Dryvit Backstop NT products as of the date of publication of this <br /> document and is presented in good faith. Dryvit Systems, Inc. assumes no liability, expressed or implied, as to <br /> the architecture, engineering or workmanship of any project To ensure that you are using the latest, most <br /> complete information, contact Dryvit Systems, Inc. at: <br /> One Energy Way <br /> West Warwick, RI 02893 <br /> (401) 822-4100 <br /> 41/ <br /> Dryvit Systems.Inc. For more information on Droll Systems or Continuous Insulatlpn <br /> One Energy Way ,visit these links. <br /> (80�0t)55677mick 2 02893 <br /> dryvit <br /> Posed in USA,Issued 11.0746 10 <br /> 00IytSystems.Inc 2009 <br />