My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOC Files (Folders 1-3)
>
CS_Courthouse Square
>
BOC Files (Folders 1-3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:07:50 PM
Creation date
8/2/2011 3:23:53 PM
Metadata
Fields
Template:
Building
RecordID
10068
Title
BOC Files (Folders 1-3)
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
608
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
02/16/99 16:37 $50~ 588 5495 HtiMAN RESOURCES ~~~ BOC <br />SAMTD Boand of Directors <br />February 'f 7, 1999 <br />Page 3 <br />previous budget, reflecting the selection of the recommended add aitemates <br />and, particulariy, the favorable bids. The project maintains a 5% confingency <br />tine item based on the antiapated construction cost <br />'! 0. The Citizsns Advisory Cammiftee voted unanimously (three membe~s present} <br />i~ f8vo~ of the staff recommendation as presented in this memo. They were <br />very pleased with the bids that were 2ceived, and the manner in which the bid <br />alfemates were dealt with. <br />11. The contract with the generaE contractor has already been developed, and was <br />reviewed and approved hy County and Distrid legal oounsels prior ta its <br />indusion in the invitation for bids. Because of this step that has been taken, we <br />expect the negofiation of the cor~trad with #he approved bidder to be relatively <br />quidc and simple_ <br />'S2. The aiterion for selECEion of the contrador as presented in the bid dacuments is <br />the lawest re5ponsible bidde~ "on the basis of the sum of fhe base bid and <br />altemat~es aucepted." <br />Recommendation <br />Staffs recammendation is unixed with that af the Countys pro~ect coordinatn~ and <br />the project's Citizen Advisory Committee: we recommend that the Board 1} <br />approve the base CH2 pro~ect afus add al~emates ' in the <br />amount of $t8.459.484 as identified in attachm~nt B tinctudinc~ exclusive <br />District fundina of Altaemates 10 11, and 15) 2~ aaprove the selection af <br />PencelKellv Construction Ine., as the iow responsive bidder and aeneral <br />corrtractor for the Cou~thouse Sauare oroiect, and 3) autho~ze the Distrt'ct's <br />Proiect Coordinator, as the Board's reprESe~tative. to ~nalize ar~d execu#e a <br />ioint contrac~ with Marion CountY and PencelKeltv for the construction of <br />Cou~thouse Sauare, and thereupon to issue notice to ~roceed. <br />~JOOa/005 <br />[c:wy Doaxr~ls~Bea~d memo re bld award~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.