2
<br /> Pence Drake Marion Westwood Nielsen Hyland 120% Amt over
<br /> ElemenUltem Kelly Construction Construction Swinerton Dillinqham Construction Median Median Median
<br /> WEATHER PROTECTION.
<br />1 Canopy System/Sidewalk 56,606 113,344 99,000 74,800 98,384 91,960 95,172 114,206 (38,566)
<br />2 Canopy System/Sidewalk 0 0 0 0 0 0 0 0 0
<br />3 Canopy System/Sidewalk 0 0 0 0 0 0 0 0 0
<br />4 Canopy System/Entry
<br />' 33,150 35,676 30,000 26,120 22,220 32,630 31,315 37,578 1,835
<br />5 Arcades 0 0 0 0 0 0 0 0 0
<br />6 Pavillions/Arcades 91,921 220,720 53,940 457,620 38,471 36,366 72,931 87,517 18
<br />991
<br />7 Pavillions/Arcades 0 0 0 0 0 0 0 0 ,
<br />0
<br />8 Pavillions/Arcades 0 ' 0 0 0 0 0 0 0 ~ 0
<br /> Subtotai 181,677 369,740 182,940 558,540 159,075 160,956 182,309 218,770 (632)
<br /> TRAFFIC SIGNALS
<br />1 Traffic Signals 141,509 90,000 105,000 98,000 178,710 135,265 120,133 144,159 21,377
<br /> Subtotal 141,509 90,000 105,000 98,000 178,710 135,265 120,133 144,159 21,377
<br /> PUBLIC UTILITIES:
<br />1 Demolish Utilities 6,332 4,270 4,800 4,500 4,950 5,744 4,875 5,850 1,457
<br />2 Construction Staking 3,495 3,200 2,000 5,000 1,650 5,500 3,348 4,017 148
<br /> STORM DRAINAGE:
<br />3 Abandom Storm Drains
<br />~ 300 2,830 2,600 2,470 2,717 275 2,535 3,042 (2,235)
<br />4 Connect Storm Drain 393 460 620 590 649 360 525 630 (132)
<br />5 Storm Trench/Granular Pipe 17,770 33,696 36,288 34,560 38,016 16,272 34,128 40,954 (16,358)
<br />6 Storm Trench/Controlled Dens 1,327 1,282 2,385 2,250 2,475 1,215 1,789 2,146 (462)
<br />7 Storm Sewer Pipe
<br />~
<br />~
<br /> (a) 10" PVC 1,805 513 456 456 456 1,653 485 581 1,321
<br /> (b) 12" PVC 760 288 240 240 240 696 264 317 496
<br /> (c) 15" PVC 12,031 4,190 4,930 4,437 4,437 11,019 4,684 5,620 7,348
<br /> (d) 15" Concrete 11,510 3,800 3,800 3,600 3,600 10,540 3,800 4,560 7,710
<br /> (e) 18" PVC 15,495 6,235 6,880 6,450 6,450 14,190 6,665 7,998 8,830
<br />8 Inlet Structures 0 0 0
<br /> (a) Type 2 Catch Basin 14,508 10,920 10,920 10,360 10,360 13,286 10,920 13,104 3,588
<br /> (b) Type 1 Clean Out 1,138 710 780 740 740 1,042 760 912 378
<br /> (c) Type 1 Catch Basin 3,109 2,115 2,310 2,190 2,190 2,847 2,250 2,700 859
<br /> (d) Type CG-2 CB 1,152 805 840 800 800 1,055 823 987 330
<br />9 Manholes 4,150 3,960 5,500 5,200 5,720 3,800 4,675 5,610 (525)
<br />10 Storm Trench Surface 1,376 555 585 540 594 1,260 590 707 787
<br />
|