My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
d <br />PENCE/KELLY Meeting Minutes <br />CONSTRUCTION, INC. ~ NO. OH <br />ra wne. ~oop sR sr.m. on naoi ~eas~ s»am <br />~~~,:u~.., F~x (60D) 6t6-7471 Project Manager: Dave Hays <br />F05.01 OLD 5/6/99 Salem Area Transit JW <br />Dave is concemed with water penetration through the elevated building slab at the TOD site. Cars parked <br />beneath may be damaged by minerals leached from the slab. <br />5/27/99 - Leonard needs to know how long the water bamer will be required before he can specify <br />a water barrier. <br />6/3/99 - Billy says that it will probably be 2-3 years before the pad is developed and it will have pedestrian <br />traffic. John will confirm this with the Transit Board. <br />F07.01 CLO 5/2T/99 Arbuckle Costlc Architects LL <br />A time capsule will be placed upon building commissioning per a forth coming Proposal Request. <br />G00.00 OLD 4/14/99 Pence/Kelly Construction, (nc. JG <br />MECHANICAL CONCERNS <br />G04.01 OLD 5/6199 Innerface Si n S stems, Inc. PW <br />The Pa~lcing Level Duct Work is being redesigned by Interface Engineering to address low clearances in the <br />Parking Garage and Exhaust fans. <br />5h 3/99 - A Proposal Request is forth coming. P/K needs this resolved before the fire sprinkler drawings can <br />be completed. PR will be issued. <br />H00.00 OLD 4M4199 Pence/Kell Construction, Inc. JG <br />ELECTRICAL CONCERNS <br />H03.01 OLD 4/29/99 ArbuCkle CostiC ArChitects LL <br />The Transformer support sled is being redesigned. Pence / Kelly needs any structural revisions immediately. <br />5/27/99 - Tim Temch needs weight requirements for the slab design. The transformer sled will be issued as <br />a proposal request. <br />6/3/99 - Tim has the weights, does not affect slab. Still awaiting the PR for the transformer base. <br />H04.01 OLD 5/6/99 Salem Area Transit JW <br />Owners to provide Security Camera heights and locations at the Bus Mall. (See RFI 183) <br />4/13/99 - Security Camera Heights will be indicated on shop drawings. Owners and Designers will meet to <br />assess their security needs. <br />4/20/99 - Conduit stub locations are needed. <br />H04.02 OLD 5/6199 Marion Coun BW <br />Owners will need additional Card Readers for 21 doors not noted on electrical prints. (see RFI 184.) <br />Melvin Mark requested that the security system be reviewed by the owners. Pence/Kelly needs rough-in <br />requirements. <br />5/13/99 - See note above. Final resolution will be issued in a PR from Leonard. <br />5/20/99 - Owners will meet to assess security requirements. PR will be issued. <br />6/3/99 - PR will be issued, information is needed prior to 01 July 1999. <br />H08.01 NEW 6/3/99 Arbuckle Costic Architects LL <br />Leonard to consolidate PGE recommendations, and make sure the planning team has all of them. <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.