My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' PENCE/KELLY <br />CONSTRUCTION, INC. <br />~ 1747 P~e~e~ LooO SE, Sal~m, OR f7702 (607) ~Y~•7227 <br />~bMand 1607) 22~J691 Faa (E03) 6~6-747~ <br />cc~ ~ ~u~s <br />Meeting Minutes <br />No. 09 <br />P~oject Manager: Dave Hays <br />Courthouse Square <br />LOCATION: Arbuckle Costic <br />MEETING DATE: 6/10/99 <br />SUBJECT: Construction Meeting <br />.• <br />. ~ <br />Y <br />. <br />BW <br />. , . <br />Bill Wasson <br />. .. . <br />Marion Coun <br />Y BC B ron Courts Melvin Mark Com anies <br />Y CL Crai Lewis Melvin Mark Com anies <br />N CP Curt Pence Pence/Kell Construction, Inc. <br />N DP Dan Petrusich Melvin Mark Com anies <br />Y DH Dave Ha s Pence/Kell Construction, Inc. <br />N EC Eric Collins Centu West En ineerin - Salem <br />Y JG John G~emmels Pence/Kell Construction, Inc. <br />Y JW John Whittin ton Salem Area Transit <br />Y LL Leonard Lodder Arbuckle Costic Architects <br />Y RC Rand Curtis Marion Coun <br />N RW Rick Wessell Melvin Mark Com anies <br />Y SW Sandra Washbum Marion Coun <br />Y SS Steve Schaad Pence/Kell Construction, Inc. <br />N TT Tim Terich Centu West En ineerin <br />A00.00 OLD 4114/99 Pence/Kell Const~uction, Inc. JG <br />PERMIT STATUS <br />A00.01 OLD 4/1/99 5H4/99 Pence/Kell Constructlon, Inc. JG <br />5/13 - Fire Sprinklers need to be submitted. Leonard will clarify with the City requirements for sprinklers in <br />the Bus Mall. <br />5/27/99 - Fire Sprinkler Drawings need to be submitted before further issues with sprinkling the bus mall and <br />canopies can be remedied. <br />6/10/99 - Drawings should be submitted this week. <br />B00.00 OLD 4H4/99 Pence/Kelly Construction, Inc. JG <br />SCHEDULE REVIEW <br />B00.01 OLD 4114/99 Pence/Kelly Constructlon, Inc. SS <br />Please see the attached schedule <br />6/3/99 - The Bus Mall po~tion of the schedule is incomplete. It will be updated when ready. <br />B00.03 OLD 4114/99 Pence/Kelly Construction, Inc. SS <br />Mass excavation is aprox. 70% complete. <br />5/27/99 - P/K has billed an additional 24% to account for over excavation. <br />Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.