My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' PENCE/KELLY <br />CONSTRUCTION, INC. <br />~ ra r«b. ~ooP sa, sa~«~, oR nao~ ~aw~ aaarrs <br />ro~u.~w teo~~:uaw~ F~x ~607) 686-1~77 <br />cc~ ~ uus <br />Meeting Minutes <br />No. 06 <br />Project Manager: Dave Hays <br />~ . . ~ . . - ~ : • • <br />F04.02 CLO 4/6199 Marion Coun BW <br />Owners will verify that their Owner Supplied Operable Partitions (Detail 12/A5.2.1) will work to comply with <br />note 4 A6.5.3, A6.4.3 and A6.3.3. <br />5/13/99 - Partitions are at the Court House, they have been taken down. <br />5/20/99 - Randy Curtis will verify that this is what the owners want to use. <br />F05.01 CLO 5/6/99 ArbuCkle Costic ArChitects LL <br />Dave is concemed with water penetration through the elevated building slab at the TOD site. Cars parked <br />beneath may be damaged by minerals leached from the slab. <br />Leonard to propose a water barrier. <br />G00.00 OLD 4H4199 Pence/Kelly Construction, (nc. JG <br />MECHANICAL CONCERNS <br />G04.01 OLD 5/6/99 Innerface SI n S stems, Inc. PW <br />The Parking Level Duct Work is being redesigned by Interface Engineering to address low clearances in the <br />Parking Garage and Exhaust fans. <br />5h 3/99 - A Proposal Request is forth coming. P/K needs this resolved before the fire sprinkler drawings can <br />be completed. <br />H00.00 OLD 4/1M99 Pence/Kell Construction, Inc. JG <br />ELECTRICAL CONCERNS <br />H03.01 OLD 4/29/99 Arbuckle Costic Architects LL <br />The Transformer support sled is being redesigned. Pence / Kelly needs any structural revisions immediately. <br />H04.07 OLD 5/6/99 Salem Area Transit JW <br />Owners to provide Security Camera heights and locations at the Bus Mall. (See RFI 183) <br />4/13/99 - Security Camera Heights will be indicated on shop drawings. Owners and Designers will meet to <br />assess their security needs. <br />4/20/99 - Conduit stub locations are needed. <br />H04.02 OLD 5/6/99 Marion County BW <br />Owners will need additional Card Readers for 21 doors not noted on electrical prints. (see RFI 184.) <br />Melvin Mark requested that the security system be reviewed by the owners. Pence/Kelly needs rough-in <br />requirements. <br />5/13/99 - See note above. Final resolution will be issued in a PR from Leonard. <br />5/20/99 - Owners will meet to assess security requirements. PR will be issued. <br />100.00 OLD 4h4/99 Pence/Kell Construction~ Inc: JG <br />SUBMITTAL REVIEW <br />100.01 OLD 4H4/99 Pence/Kell Construction, Inc. .JG <br />Please see the Submittal Log dated 5/20/99 <br />J00.00 OLD 4NM99 Pence/Kell Construction, Inc. JG <br />RFI REVIEW <br />J00.01 OLD 4/14/99 Pence/Kell Construction, (nc. JG <br />Please see the Outstanding RFI Log dated 5/20/99 and items marked as urgent. <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.