My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br />' PENCE/KELLY <br />CONSTRUCTION, INC. <br />~ rra v.ne. ~.ooP sa, s.am, oR nw: ~eos~ anarx- <br />v«n«w ~ew~ ssaao~ i.x ~em~ s~aa~n <br />cc~ ~ ~sus <br />Meeting Minutes <br />No. 08 <br />Project Manager: Dave Hays <br />Courthouse Square MEETING DATE: 6/3/99 <br />LOCATION: Arbuckle Costic SUBJECT: Construction Meeting <br />. ~ <br />Y . <br />BW . . . <br />Bill Wasson • •. . <br />Marion Coun <br />Y BC B ron Courts Melvin Mark Com anies <br />Y CL Crai Lewis Melvin Mark Com anies <br />N CP Curt Pence Pence/Kell Construction Inc. <br />N DP Dan Petrusich Melvin Mark Com anies <br />Y DH Dave Ha s Pence/Kell Construction, Inc. <br />N EC Eric Collins Centu West En ineerin - Salem <br />Y JG John Gremmels Pence/Kell Construction, Inc. <br />Y JW John Whittin ton Salem Area Transit <br />Y LL Leonard Lodder Arbuckle Costic Architects <br />Y RC Rand Curtis Marion Coun <br />N RW Rick Wessell Melvin Mark Com anies <br />Y SW Sandra Washbum Marion Coun <br />Y SS Steve Schaad Pence/Kell Construction, Inc. <br />N TT Tim Terich Centu West En ineerin <br />, ~ • • ~ ~ ~ , ~ • • • <br />A00.00 OLD 4I1M99 Pence/Kelly Construction, Inc. JG <br />PERMIT STATUS <br />A00.01 OLD 4/1/99 5114/99 Pence/Kell Constniction, Inc. JG <br />5/13 - Fire Sprinklers need to be submitted. Leonard will clarify with the City requirements for sprinklers in <br />the Bus Mall. <br />5/27/99 - Fire Sprinkler Drawings need to be submitted before further issues with sprinkling the bus mall and <br />canopies can be remedied. <br />B00.00 OLD 4/14/99 Pence/Kell Construction, Inc. JG <br />SCHEDULE REVIEW <br />600.01 OLD 4N4/99 Pence/Kell Construction, Inc. SS <br />Please see the attached schedule <br />6/3/99 - The Bus Mall portion of the schedule is incomplete. It will be updated when ready. <br />B00.03 OLD 4H4199 Pence/Kelly Construction, Inc. SS <br />Mass excavation is aprox. 60% complete. <br />5/27/99 - P/K has billed an additional 24% to account for over excavation. <br />Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.