Laserfiche WebLink
~ COURTHOUSE SQUARE <br />PRO)ECT NO. 9828 <br />' FIELD OBSERVATION REPORT NO. 33 <br />August 24. 2000 <br />Page 3 of 3 <br />I ' <br />--~ <br />5. Storage Room 1234: <br />a. Room needs general clean up. <br />b. Missing all ceiling tile. <br />c. Door Frame paint overspray onto wall needs to be cieaned off or painted over. <br />d. Door 1234A frame needs to be refinished at the bottom. <br />6. Confe~ence Room 1204: <br />a. Missing carpet base generaliy throughout the Room. <br />b. Missing siil for window stool. <br />c. Opening in ceiling for speaker, needs to be put in place. <br />d. Generai cleanup required. <br />cc: Billy Wasson~ Marion County <br />John Wtiittington, S.A.M.T.D. <br />Craig Lewis, Meivin Mark Development Corp. <br />Bob McCune, Marion County <br />Century West Engineering <br />Interface Engineering <br />Westech Engineering <br />Pence/Kelly Construction <br />File <br />By:`- Ceonard Lodder, AIA <br />File: 982&9A <br />This confiRns and recoMs our interpretation of the discussions which occurred and our understanding reached during this meeting. <br />Please notify in writing within seven days of the date indicated above if the interpretation or description is incomplete or inacxurate. <br />