My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Miscellaneous
>
CS_Courthouse Square
>
Meetings Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:34:24 AM
Creation date
8/5/2011 2:34:11 PM
Metadata
Fields
Template:
Building
RecordID
10094
Title
Meetings Miscellaneous
Company
Staton Construction, INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Concern was expressed about the security gates for the bus mall not being <br />included in the streetscape package approved by the city. We should explore a <br />less expensive option for the gates. Leonard had an opportunity during the <br />past few months to do some testing of different ideas for the canopy <br />structures with pricing at about 1/3 the cost of original estimates. He will <br />continue to test ideas that make sense to get better cost and make the weather <br />protection system work better. The canopies will cover the buses with an <br />opening down the middle of the mall. They are still developing the <br />requirements for overall angle and height over the buses to provide maximum <br />weather protection. Transit will get a CAD drawing of the natural gas buses <br />that will be implemented and used in the mall. <br />4. Next Meeting <br />The next meeting is scheduled for May 21st with a lunch meeting from noon <br />until 2:00 p.m. The sensitivity analysis staff work should be ready for <br />discussion at that meeting. <br />Meeting Adjourned. <br />
The URL can be used to link to this page
Your browser does not support the video tag.