Laserfiche WebLink
Courthouse Square Project <br />LEED Certification <br />June 17, 1999 Meeting Minutes <br />Attendees: <br />Tracy Hokanson, Interface Engineering <br />Billy Wasson, Marion County <br />Jim Sears, Marion County <br />Randy Curtis, Marion County <br />Bob McCune, Marion County <br />Bonnie McCullough, Marion County <br />Leonard Lodder, Arbuckle Costic Architects <br />Oliver Raab, Interface Engineering <br />Craig Lewis, Melvin Mark Development <br />Byron Courts, Melvin Mark Development <br />John Gremmels, Pence/Kelly <br />. Actions Re uired: <br /> Ezpected <br /> Completion <br />Action Res onsible Pa Date <br />Inquire about purchasing the DOE2 study from PGE and the cost of <br />the stud . B on Courts June 25 <br />Put together cost proposal to pursue outstanding credits and forward <br />to Holl Stirnkorb. I,eonard Lodder June 25 <br />Attempt to negotiate credit for the water conserving fixtures with <br />the LEED Committee. Holl Stirnkorb Jul 9 <br />Attempt to negoriate credit for a permanent air monitoring system <br />with the LEED Committee Holl Stirnkorb Jul 9 <br />Next Meeting: <br />Thursday, July 1, 1999 <br />10:30 a.m. <br />Arbuckle Costic Architects, 363 State Street, Salem, Oregon <br />Minutes• <br />I. Review LEED Credits That Have Been Achieved <br />Holly Stirnkorb distributed an updated LEED Compliance Evaluarion Matrix and reviewed the <br />eleven points that have been achieved. The Mah-ix contains an error. It states that the IPMVP <br />credit has been achieved. This credit depends on access to the DOE2 study, which is pending the <br />decision to participate in the PGE Earth Smart program As a result, a total of eleven points have <br />been achieved rather that the twelve points listed on the Matrix. <br />Holly explained that the LEED pilot program also offered a green building rating at the Pioneer <br />Level for aclueving twenty points. <br />~II. Discuss LEED Credits That Require Clarifications or Modificarions <br />The group discussed the outstanding credits as follows: <br />• Infill Development - Clarification is needed from the City of Salem, but it is highly likely <br />that the point can be achieved. <br />• Energy Ef~'iciency Level 1- Oliver Raab discussed his cost proposal to achieve this point. <br />• Ener~v Efficiency Leve12 - Oliver Raab discussed his cost proposal to achieve this point. <br />The group discussed the possibility of participating in the PGE Earth Smart program to obtain <br />this point and also get access to the DOE2 study. The County may not participate in the PGE <br />~.. <br />