Laserfiche WebLink
_~ Marion County Facilities Master Plan <br />~ in size. Conditions vary, but generally are in moderate condition. <br />-~ Floors The basement is floored in vinyl composition tile, which is in good to <br />moderaYe condition. The remaining floors are carpeted with dense ]oop pile. <br />All carpeting dates from the 1973 renovation and is showing signs of wear. <br />~ Office spaces aze showing similar degrees of wear, although not as bad as <br />_. comdor spaces. Carpeting will need replacement in near future. <br />-~ Finishes In general, interior design of facility is of private office use. Finishes are <br />durable and utilitarian in nature, there is no noticeable interior design theme. <br />Finishes are showing signs of normal wear and tear, but have been well <br />~ maintained. <br />Furnishings Fumishings are generally daYed but in good condition and may not be the best <br />~ ergonomic conSguration. Ergonomics may be the primary reason for <br />- - replacement. <br />~ Toilet Rooms Toilet rooms are showing signs of normal wear and tear, but have been well <br />maintained. Public accommodations epst on the fifth floor, consequently <br />~ modifications have been made to the fifth floor toilet rooms to meet ADA <br />requirements: Fixtures may need replacement in near future, but are adequate <br />- at this time. <br />~ Signage There is very little internal signage or way finding. Concepts for long range <br />planning should limit public access beyond public areas; therefore not require <br />-~ extensive signage. The fiRh floor, however, will require new and additional <br />signage to meet ADA requirements. <br />~ Artwork Thereis little, if any, notable artwork The addition of aztwork and an interior <br />color scheme could have a positive impact on visitors and users. <br />7 CIRCULATION <br />-~ Stairwell Stairwells are in good condition; howevu, they do not meet current width and <br />railing requirements. Aside from code issues, all stairwells still function <br />adequately. <br />l Elevator Two elevators were installed in the 1973 renovation. Operation is controlled <br />~ <br />Page 77 <br />.J <br />