My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Steering Committee(Folders 1-2)
>
CS_Courthouse Square
>
Meetings Steering Committee(Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:37:49 AM
Creation date
8/5/2011 3:34:36 PM
Metadata
Fields
Template:
Building
RecordID
10093
Title
Meetings Steering Committee(Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Therefore, it is recommended that a new county administration <br />building be constructed in the Senator Block, and adjoined to the <br />present Courthouse via either a skybridge or tunnel. Our <br />recommendation is driven by this logic: <br />1. It is most cost effective and efficient to have all county <br />administrative departments in the same building. <br />2. The current courthouse cannot be remodeled to provide <br />. enough space to accommodate these departments. <br />3. The overall cost to implement our recommendation is at <br />least $2.4 million less than that of the Courts Sub- <br />Committee. <br />Not discussed at length with, nor adopted by the Sub-Committee is <br />the possibility of a new building added to the existing Courthouse <br />which will house both the administrative services and the Courts. <br />This may provide for the space and service needs of both groups <br />without being confined to the size of the existing building. <br />
The URL can be used to link to this page
Your browser does not support the video tag.