My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Steering Committee(Folders 1-2)
>
CS_Courthouse Square
>
Meetings Steering Committee(Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:37:49 AM
Creation date
8/5/2011 3:34:36 PM
Metadata
Fields
Template:
Building
RecordID
10093
Title
Meetings Steering Committee(Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COST <br />~ Building <br />• Approximate $2mm for a 18,000 gross square foot building. <br />(This estimate takes into account the 14,600 square feet recommended by the <br />facilities consultant for needed work area, the approximate 2,300 square feet of <br />space required to include the administrative staff and supervisors from the Roads <br />division, the extra common space needed that would otherwise be provided in a <br />larger facility and space required for basic building operations, ie: ventilation <br />equipment, utility closets, etc.) <br />~ Grounds <br />• Upgrade septic and water systems. (The current water system is in <br />need of work, but could facilitate a new building. There would have to be some <br />septic changes made at the site. Approaching the city of Salem to provide water <br />and sewer service extraterritorially would also be considered. The exact costs of <br />• these upgrades is unknown at this time.) <br />Total Annual Return on Investment = 10-12% <br />facilty2.wp 03/l3/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.