My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Steering Committee(Folders 1-2)
>
CS_Courthouse Square
>
Meetings Steering Committee(Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:37:49 AM
Creation date
8/5/2011 3:34:36 PM
Metadata
Fields
Template:
Building
RecordID
10093
Title
Meetings Steering Committee(Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f ,. <br />(-~ <br />FACILITY STEERING COMMITTEE MESTING <br />March 15, 1995 <br />PRESENT: Ken Sherman, Randy Curtis, David Glennie, Maynard <br />Hammer, Fritz Skirvin, Mike Murray, Valerie Vollmar, <br />Bob McCune, Gary Heer, Bob Royer, Larry Oglesby, Starr <br />Garland, Ruth Johnson, Ken Roudybush, Mark Caillier, <br />Jack Munro and Lydia Buchanan <br />GUEST: Bob Hansen, Billy Wasson and Ed Cavialle <br />MINUTES: Approved <br />PUBLIC WORKS: <br />Public Works Director, Bob Hansen was at the meeting to <br />discuss their recommendation for moving Public Works <br />operations out of the Downtown area. Public Works <br />would construct a new 18,000 (gross) square foot facil- <br />ity at their Roads Campus on Silverton Road. They had <br />an outside consultant confirm the need to consolidate <br />operations at the shops. <br />Records will be automated to provide better service to <br />the downtown users. Public Works will also continue to <br />have a small liaison office of staff in downtown, <br />preferably in conjunction with the Community Develop- <br />ment Department. <br />REVIEW OF FINAL REPORT: <br />The draft report was reviewed by the committee. A <br />revised report with the changes underlined will be sent <br />out prior to the next meeting. <br />The following is a summary of the changes requested by <br />the committee: <br />l. The Introduction should be rewritten giving <br />more information about the background and scope of <br />the committee's work. <br />2. The reports on each facility project should be <br />modified so the recommendations appear at the <br />beginning of each section. <br />3. The committee also wanted more information on <br />square footage for some of the proposed facili- <br />ties. <br />
The URL can be used to link to this page
Your browser does not support the video tag.