Laserfiche WebLink
, <br />Juv,IHealth Campus <br />Downtown Campus <br />r~ <br />~ ~ <br />L .1 <br />~ <br />Sell Franklin <br />iilablc Center <br />~ ~~es te C°Unt <br />, Y <br />~Pa~ <br />~~ \ ~ fh PrA, <br />~ r ~~ <br />~ ~ - <br />i C ~ <br />\`/ <br />L _ .~ <br />Construct a new 96 bed Juvenile facility <br />on 6 acres west of the present faciliry, <br />Add 32 bed pod when needed. Cost; $18 million. <br />Phase I, remodel the vacated Juvenile office <br />and Health building. Relocate space leased <br />by Health to this campus. Cost; $2 million. <br />Phase ll, construct addition to the Health <br />Building. Cost: $4 million. <br />~ n C~ <br />0 <br />o par%/A b <br />U <br />~i <br />Sheriff o° 1 , <br />Consolidate County Offices into one facility and <br />remodel the Courthouse to upgrade securiry and add <br />new courtrooms. <br />0 tion 1; Evaluate the Equitable Center for <br />future use as a Public Service Building. <br />Cost: $9.6 -11.6 million. <br />0 tion 2: If option 1 is not feasible, construct a <br />new Public Service Building on the Senator <br />Block. Cost: $19.6 million. <br />CorrectionslTri-Agency <br />, Campus <br />~ <br />i. <br />? ~~ <br />~~ <br />~ She~ <br />~ <br />galem P~D' <br />State Po-ice <br />Construct a 165,000 sq, ft. Joint law enforcement facility. <br />The Sheriff and Corrections will vacate the Work Release Ctr, <br />making room for 20 additional beds. Parole and Probation <br />will relocate to the Jail campus, Cost: $30 million. <br />. <br />