My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Steering Committee(Folders 1-2)
>
CS_Courthouse Square
>
Meetings Steering Committee(Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:37:49 AM
Creation date
8/5/2011 3:34:36 PM
Metadata
Fields
Template:
Building
RecordID
10093
Title
Meetings Steering Committee(Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Marion County Tri-Agency Facilities Master Plan <br />The spaces of the facility have been organized around a courtyard, providing a central visual <br />amenity which unifies the complex and reinforces the consolidation objectives of the joint <br />agency facility. The courryard is used to bring light into the building while serving to <br />enhance certain staff and public spaces with views of its planu and play of sunlight. Those <br />spaces with visual aecess to the courtyard are: <br />• the public meeting room <br />• the fitness space <br />• the large roll call room <br />• public and staff circulation <br />The public ]obby provides open public access to the courtroom, the public meeting room, <br />and the consolidated recotds counter. Public movement beyond this point is screened by <br />staff and_ metal detectors. <br />Staff enters specific zones of the building by agency function with access to multiple levels <br />of the building. The city's communication division and the state's regional dispatch center <br />are situated on the third floor of the facility to be separate afld secure from the public and <br />from other functions of the faciliry. <br />T'he first level houses functions that reqwre public access and access for field operations <br />personnel of the three agencies. Public spaces such as the courtroom, the public meeting <br />room and consolidated records are immediately accessible at the public lobby. Semi-public <br />spaces requiring less frequent admission of public, including the Sheriff's Central District <br />Station and the State Police's Salem Patrol Office, are located beyond the public screening <br />point behind the open public lobby. Staff-accessible functions of Salem Police Department's <br />Field Operations, consolidated lockers, evidence and properry storage are located to the rear <br />of the first ]evel. Public access to evidence and property for viewing or retrieval of property <br />is on the west side of the building, where parking and a loading area have been provided. <br />The building must continue to seive the public in emergency situations due to man made <br />or natural disasters. Therefore, the structure must withstand major earthquakes. The <br />substructures and superstructure of the facility must be designed to zone four seismic <br />requirements. The design and materials selected for this structure wi11 be ]ong lasting with <br />a]ife expectancy of at least 100 years. <br />_ • ~ <br />Page 41 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.