My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEED- Miscellaneous
>
CS_Courthouse Square
>
LEED- Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:28:41 AM
Creation date
8/15/2011 2:31:18 PM
Metadata
Fields
Template:
Building
RecordID
10247
Title
LEED- Miscellaneous
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Energy
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Points Points <br />Credit Description Possible Scored <br />ENHANCING INDOOR ENVIRONMENTAL QUALITY (Cont.) <br /> Design all chemical storage/mixing areas for housekeeping <br /> products (central storage facilities and janitors closets) to <br /> allow for secure product storage in spaces that have water in <br />Design of the chemical concentrate mixing areas, with drains plumbed <br />Chemical Storage for the appropriate disposal of liquid waste, separate outside <br />Areas venting, and negative pressure. 1 1 <br />Status: Confirm compliance wit/: Mechanical Engineer. <br />Responsibility: HLA to diseuss with Mechanical Engineer. <br /> Include permanent architectural entryway systems (e.g. <br />Architectural grills, grates) designed to catch and hold particles to keep <br />Entryways them from contaminating the building interior 1 1 <br />SAFEGUARDING WATER <br />Prerequisite 1 <br />Water Comply with Plumbing Fixture Requirements of Energy <br />Conservation Policy Act of 1992 0 Achieved <br />Prerequisite 2 Meet the requirements of EPA Publication #812-B-94-002, <br />Lead in Drinking Lead in Drinking Water in Schools and Non-Residential <br />Water Buildings, April 1994 0 Achieved <br /> Install oil grit separators or water quality ponds for pre- <br />Surface Runoff treatment of runoff from surface parking areas; construct <br />Filtration underground parking 1 1 <br />BONUS CREDIT <br />Salvage and Apply for a bonus credit for the level of salvage and <br />Recycling recycling that occurred during the demolition 1 <br />Status: Negotiating point with the LEED Committee <br />Responsibility: HLA <br />DESIGN EXCELLENCE <br />LEED Certified Team includes at least one principal designer who has <br />Designer satisfactorily completed LEED Design Training Course 1 1 <br />Status: A member of the Design Team will need to attend training once it is implemented by IISGBC. <br />Responsibility: Assign rriember of the Design Team. HLA to notify dute, time, location antl cost of <br />training. Estimated cost of training course is $1 SD plus transportation to Portland <br />TOTAL 23 19 <br />~ vue pu~c~~ ~5 avaiiaoie ~i one or iwo creaits m tnis category are achieved. "l~wo points are available if all <br />three credits are achieved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.