Laserfiche WebLink
PENCE/KELLY <br />November 9, 1999 <br />(503) 399-7223 <br />(503) 585-7477 Fax <br />(503) 224-8681 Portland <br />Billy Wasson John Whittington <br />Marion County Sal~m Transit <br />3150 Lancaster Dr. NE 314~ Del Webb Avenue NE <br />Salem, OR 97305 Saler~, OR 97303 <br />\ <br />RE: PR 50 and 51 pricing approval <br />Dear Billy and John, <br />o`~p GIMIII~~,~ <br />Nea <br />f~ C Sa° <br />,f I M11~~~~ <br />CCB ~63435 <br />I submitted COR's for PR 50 and 51 on November 4, 1999. The deadline for <br />acceptance was November 8, 1999. Immediate acceptance or rejection of this <br />work is critical due to the time constraints of this project. The following are just a <br />few areas that are being impacted at this time: hollow metal doors and hardware <br />revisions, terminal unit ordering, fire sprinkler redesign, sprinkler pipe fabrication <br />and delivery, plumbing rough-in, electrical rough-in at slab pours and plumbing, <br />• HVAC, fire and electrical coordination above the ceiling. <br />PR 50 and 51 were supposed to have been issued by our September 1St <br />deadline. We did not get the final revisions and direction on PR 50 until <br />October 13, 1999. While doing our final review of the Subcontractors pricing we <br />discovered that there was still further confusion with the revision numbering of <br />the drawings. We had the Subcontractors correct their pricing and submit their <br />pricing with the corresponding PR. <br />PR 50 and 51 impacted many schedule critical tasks. Pence/Kelly has expedited <br />the COR pricing and now ask that direction on these issues be given now before <br />additional delays occur. <br />Thank you for your attention to this issue. <br />CONSTRUCTION, INC. <br />P.O. Box 4109 <br />2747 Pence Loop SE <br />Salem, OR 97302-8109 <br />'ncerely, <br />~ <br />Dave Hays <br />Project Manager - Courthouse Square <br />• Cc: Craig Lewis <br />"Creating Landmarks of Excellence" <br />