Laserfiche WebLink
extra soil as possible so there would be as little fill and compaction as possible. Kathleen _ <br />~ proposed that the cleanup for the UST's and Chevron be approached separately as each <br />would require different levels of investigation. Kathleen estimated total UST cleanup <br />time to be three weeks. <br />Dewatering <br />7-10 If P 2 is no longer being considered, Mike H. does not require the completed GRI drilling <br />report. Dan asked that the data gathered be sent to Marion County in case o~ future <br />needs. Additionally, the data could provide some useful information pertairling to soils <br />conditions on the site; e.g. GRI discovered a subsurface void during their in~vestigation. <br />ACTION: Bill to generate a revised wark arder to include only work condt~cted to date. <br />Stan Kelsey and Mike to review revised drainage and dewatering needs. Ron to research <br />a"no water discharge" cleaning system for P 1. <br />Structural <br />7-17 The cost of shearwalls appears to be far greater than originally anticipated. The cost to <br />go to a rigid frame adds $2.50 per sf. The decision to utilize strictly shearw~lls needs to <br />be reexamined. ACTION: Curt Pence, Leonard and Mike Hayford to meet'to determine <br />actual costs and impacts of each option. <br />7-10 Dan suggested that the County and Transit might want to consider making ~ight <br />modifications to the structural plans in order to facilitate future floor penetr~tions for <br />communicating stairs. ACTION: Leonard will attempt to locate areas wh~re this might <br />be desirable. <br />6-27 ACTION: Mike Hayford will provide MMDC with a list of owners who h~ve recently <br />completed PT office buildings. MMDC to contact these owners to gain the~r insights. <br />Rev. 7-3 Leonazd to contact Mike to reconfirm this as an action item. Rev. 7-10 <br />MMDC would like to pursue the marking the tendons and installing floor ta floor <br />knockouts. <br />Signage <br />6-27 MMDC inquired as to building standard signage design responsibility. Leonard <br />confirmed that signage design would be done in-house. R.G. indicated that Transit and <br />Marion County are developing a logo and design for the project that will prQbably be <br />incorporated to some degree in non-code building signage. ACTION: MM~C will <br />provide some examples of building standard signage. <br />Building Systems <br />7-17 Byron proposed that Interface take responsibility for coordinating life safety <br />requirements. <br />6-27 MMDC inquired whether PGE has been apprised of the electrical needs of t~e project e.g. <br />power requirements and availability of services. Leonard indieated that PG~ has been <br />involved from the beginning and there is no indication of a problem with capacity. Rev. <br />~ 7-3 Dan inquired whether Civil has confirmed adequacy of services for other utilities, <br />