<br />Courthouse Square Streetscape
<br />~
<br />~
<br />With Parking With Parking
<br />Option #2 Option #3
<br />Demolition curb/AC
<br />Demolition of existing bus facility
<br />Earthwork
<br />Relocate sanitary sewer
<br />Patch AC
<br />Landscape / irrigation
<br />Concrete
<br />Precast
<br />Pavers
<br />Masonry
<br />Steel
<br />Roofing / waterproof
<br />Sheet metal
<br />Glass ~ clock tower
<br />Paint underside shelters
<br />Benches / grates / bike racks / receptacles
<br />Fire protection
<br />Mechanical drains
<br />Elect~ical including clocks
<br />Signalization
<br />Subtotal
<br />General Conditions C~ 4.6%
<br />P&OC~4.9%
<br />TOTAL
<br />$17,700 $17,700
<br />35,000 35,000
<br />15,917 45,059
<br />75,000 75,000
<br />. 13,962 13,962
<br />24,450 24,450
<br />219,212 224,291
<br />12,600 12,600
<br />330,000 330,000
<br />30,120 30,120
<br />280,000 280,000
<br />~2~ 126 56,554
<br />29,200 29,200
<br />20,500 20,500
<br />5,000 5,000
<br />50,000 50,000
<br />12,000 12,000
<br />24,000 24,000
<br />141,716 141,716
<br />50.000 50.000
<br />1,458,503 1,477,152
<br />67,091 67,949
<br />74.754 75.710
<br />$1,600,348 $1,620,811
<br />7/17/97