Laserfiche WebLink
~ <br />Courthouse S uare Parking Garage ~ ~ <br />q <br />~` 324 Stalls 368 Stalls <br />Option #3 Option #2 <br />Shoring $279,680 $476,100 <br />Excavation 571,826 593,961 <br />Masonry 39,100 39,100 <br />Concrete • ~ 2,842,190 3,153,422 <br />Stairs 30,000 30,000 <br />Hoilow Metal 3,500 3,500 <br />Coiling Grille 6,342 6,342 <br />Water Proofing 434,600 514,992 <br />Aluminum Doors 7,500 7,500 <br />Rubber Treads 2,720 2,720 <br />~ Signage 1,500 1,500 <br />Elevators 73,400 73,400 <br />Mechanical (w/o underslab drain) 275,988 288,000 <br />Fire Protection 119,180 125,000 <br />Electrical 191,403 200,750 <br />Subtotal 4,878,929 5,516,287 <br />General Conditions C~ 4.6% 224,430 253,749 <br />P& O C~3 4.9% 250,065 282.732 <br />TOTAL $5,353,424 $6,052,768 <br />Cost per Stall $16,523 $16,448 <br />~ <br />7/17/97 <br />