Laserfiche WebLink
cost for the assessment will go to transit. RG said that he wants to close in Jan ary and it will <br />be much simpler if the level one's are completed. Dan reported that it will co $62,000.00 to <br />finish assessing the Marion County property. ', <br />Dan explained that a level one is not going to tell us what is in the ground. Iti will tell us the <br />history of the property. He asked if this was done in 1974. Randy said that it s unlikely. He <br />said the test core drillings will give him more information on the property than ~he level one's. <br />Dan said that Centurywest will need to drill 25 test core drillings. ' <br />Dan reported that Bob Cannon had told him that the Beri building had once b~en the site of a <br />Union 76 station. Ra.ndy said that he knew there had been a service station lo~ated there, but <br />~actly where on the site was not known. Da.n reported that Kathleen has done history search <br />on the block but cauld not fmd it. Randy stated that the other thing that is strang~e about the site <br />is that the design is consistent with that of a theater, meaning the sloping floorS. <br />Note: Bob McCune will need to coordinate with the employees who ~ark in the area <br />where boring will be done. Time estimate: 1- 1'h weeks. I <br />Title Problems ~ <br />Dan reported that there is a potential chain-of-title problem on the Senator and~ Beri buildings. <br />Dan said that Randy needs to look for title insurance documents from when e building was <br />purchased. Dan said that his concern is that this is a potential problem down e road with the <br />underwriter. ' <br />ACTION: Randy will begin researching this to see if there was title insura~ce on the 1974 <br />purchase. ' <br />Disposal of Soil ' <br />Dan reported that Kathleen has met with Solid Waste to get a cost for isposal of the <br />contaminated soil. She was quoted $32.00 to $35.00 per tone, plus trucking at $.00 a ton. She <br />says that the market rate is between $25 -$30 a ton. Dan said that when you tru k contaminated <br />soil to another site, you inherit the liability on that soil. The percentage of liabi~ity is relatively <br />small, but the liability does go to the county. ' <br />ACTION: Randy will step in and try to negotiate a better rate with Solid VfJaste. <br />ITEM 2: GMP '~~ <br />Dan introduced the subject of the GMP. He reported that Curt has ob ined a bid of <br />$22,623,751. Dan has added back cost saving ideas of $3,229,510 for a total f$26,757,041. <br />Dan said that we need to assess who will be responsible, among the players, f r the shell cost. <br />He is beginning to assess what items are applicable to only the county and transi .(see attached) <br />14,394,000 shell cost, at 172,OOOsf, shell price 83.69, removing the <br />~ Streetscape <br />