~ <br />we are competing for Steve's time while he is working on another county project. If t~his is the case, <br />Randy asked to be informed so he can bring the parties together to set some prioriti~s. <br />5th Floor: Dan reported that with the parking stall cost down, he had assumed he would get his <br />overall costs down by putting the fifth floor on the building. There are assumptions at the county <br />and transit will be paying 100% for some of their design features. His conc rn is that by <br />compensating the county for the land lease and parking, he may not be able to get the umbers down <br />to an amount that he can afford. If the fifth floor doesn't get built we might get a GM~ that is higher <br />than what has been forecast by having a two story parking structure. The county v~nll ot suffer. RG <br />may, but he is a little over budget. Dan does not have a back door. If he doesn't get he fifth floor, <br />he will lose his investors. Once the cost goes over $50.00 sf, his backers will lose in erest. $45.00 <br />sf is acceptable. He doesn't have the high ti costs for retail that he has for the office space. Dan is <br />very confident that we can get there with what we know today, but it is very tight. I <br />Dave reported that Curt generated the pricing from contractors and we should hav~ current rates. <br />Alan asked if these are based on current construction market rates, or what we will ~ee in the fall. <br />Dan said that we are not locking prices on the structure until November or December. Everyone <br />agreed that the later, the better. Dan wants a presentation for Randy and the Finance Team by the <br />end of next week. <br />Randy is concerned that if the cost of the fifth floor is under $50.00 sf and the rest the structure <br />is $58.00 sf, it would appear that the fifth floor was subsidized. He has to be certain ~at the county <br />doesn't give anything away. We need to be able to show the benefit of the fifth floor to the rest of <br />the project or it will not survive the audit. Dan said that he has to be careful of the ove~all blend rate. <br />He still has to contribute to the cost of the structure below. !i <br />Design: The design will be completed by June 4. Dan and Randy will meet w~th the finance <br />team next week. I <br />RG reported that there is growing concern from the merchants on High Street that t e project will <br />take away their parking. They are also concerned about the noise and nuisance of th construction. <br />RG wants us to be proactive by getting a statement out as to what street areas we wi~l take up with <br />construction. Alan said that we would be taking the parking lane from Chemek~ta, Court and <br />Church. Len said that there may be periods of time when we will have to impede the arking on the <br />High Street side. There was discussion around taking the parking off High Street wl~en the project <br />is complete. When transit takes out the space on High Street, parking will be returnjed to the front <br />of the Courthouse. ' <br />The plaza space can be used for staging for the most part. Once the parking garage i~ complete, we <br />have the azea of the bus mall for staging. Contractors are going to want trailers onl the site. Dan <br />suggested staging on the Courthouse block, but Randy doesn't think this will happen. ~'~, It will impede <br />on the courts and the visitors to the courthouse. ' <br />RG asked that the team make some of these decisions now, to be proactive. <br />