My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development Team Meeting Notes (96-99)
>
CS_Courthouse Square
>
Development Team Meeting Notes (96-99)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:47:33 AM
Creation date
9/6/2011 10:03:43 AM
Metadata
Fields
Template:
Building
RecordID
10302
Title
Development Team Meeting Notes (96-99)
BLDG Date
8/19/1997
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br />mechanical designs as well. The 5 story meets county's 20 year projections, but still may be a little on <br />the high side as faz as square footage needs. <br />~ Takin these numbers and addin in TI costs from revious calculations, we are still at $21 million. <br />S g P <br />Randy and RG believe that number needs to be down at the $18 million figure. Some discussion was <br />held if the TI costs were an accurate number to include. As far as TI's, county needs to pick a position <br />and put it in the model and don't count on income in the performa. We have to go in with streetscape <br />assuming it is a wash. The numbers that NIl~IDC will put together will give us a better target. It may <br />help county out, but end up hurting tiansit. MIVIDC will have more information ne~rt week. <br />We can focus on areas to cut or refine. We can squeeze the parking and shell and get tighter numbers <br />structurally. Streetscape will take care of itself. Let's also look at pulling out 5,000-10,000 sf from <br />building. Leonard has worked on a version that would do this. County had concems about indirect <br />costs savings for giving up both space and income down the road and what it actually gains the project. <br />Leonazd did a quick diagram with options to cut space, but it is limited by columns relarive to parking <br />structure below. Right now we have a very efficient parking struchue. Working off the ideal floor plan <br />that Dan and Craig have discussed thaR has a very efficient center core, lays out well and also leases well, <br />cutting a section from this would not impact the design. It will shift about 2 feet on each side and won't <br />be noticed that much. <br />Work needs to commence on toning the shell and pazking mechanically, electrically, and structurally. <br />Leonazd and Dave need to have a meeting to work on these areas as soon as possible and work with <br />Interface on being more conservative in their numbers. <br />~ Byron asked if there are certain performance requirements to target to give Pence/Kelly more direction as <br />to the true goals. Can we address the $2 million? County responded that there are choices to be made <br />and it also depends on the interest rate available. The amount the county needs to borrow is critical. <br />There isn't enough daia yet. Right now it shows we are off by $2 million, but it could go away. The <br />target is not yet identified. <br />Latest Design <br />There is not a lot to show with regard to status of new concepts. The architect's office is continuing <br />efforts to rationalize window schemes. Leonard can bring in drawings ne~ week to look at. We are <br />looking ai options for a window scheme that would work better and make Dave happier. The issue of ~ <br />concrete vs. steel has been raised with Mike Hayford, but we have not received any feedback. There are <br />options to be analyzed as far as cost and/or time savings, as well as fireproofing the building. Additional <br />discussion was held regarding availability of steel for the project. Given our current schedule, saving <br />time in construction won't save dollars. We need to cut the cost of maierials. The time savings will <br />affect overhead for Pence/Kelly, not the whole project. FTA funds are not limited by any time <br />restrictions. <br />North End Retail <br />We have about a two to three week time frame before the RFP will be going out on the rztail <br />development. We need to be thinking about different aspects of this process like how stringent in design <br />review, how it will blend with our project and how logistically it will be reviewed. Defining <br />compatibility is very subjective. We don't want to put too many conditions up front. There would be a <br />review committee. County, transit and the developer will work together to continue the review process. <br />There has been very positive interest by the northem neighbors of the project. Our leasing agent has <br />indicated that the value of property on the west side of High Street will be extremely high. We want to <br />~, continue to include the adjacent businesses in our considerarions. <br />Page 3 of 4 <br />