My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Special Project Oversight Committee (SPOC) Report #1
>
CS_Courthouse Square
>
Special Project Oversight Committee (SPOC) Report #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:44:14 AM
Creation date
9/6/2011 12:12:53 PM
Metadata
Fields
Template:
Building
RecordID
10317
Title
Special Project Oversight Committee (SPOC) Report #1
Company
Marion County
BLDG Date
11/14/1997
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9601 Courthouse Square Research
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
quality control files and data on behalf of the Owner. Review, process and <br />implement changes in the work to include change orders, filed orders and job <br />instructions. Perform the following specific tasks in support of this requirement: <br />1. prepaze daily observation report. <br />2. review product submittals and shop drawings on behalf of the Owner. <br />Alert azchitect and Owner of any submittal not in compliance with <br />specifications. <br />3. attend contractor coordination meetings. <br />4. maintain orderly files for: a) Correspondence; b) Reports of job <br />conferences; c) Governmental and special inspections; d) Reproductions of <br />original contract documents including all addenda, change orders and <br />supplementary drawings issued subsequent to the awazd of the contract. <br />5. represent the Owner in regular and special meetings of the project team <br />considering such matters as progress, procedures, problems and conflicts, <br />6. advise the Owner of issues, problems or concerns, including circumstances <br />which may result in claims, delays or cost overruns, and help devise <br />solutions; and <br />7. all other services necessary to complete construction of the Building <br />substantially in accordance with the Final Plans as soon as is practicable, <br />including the administration of Other Project Contracts. <br />6.2 All requests for changes in, modifications of or supplements to the Final Plans <br />
The URL can be used to link to this page
Your browser does not support the video tag.