My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Precision Industrial
>
CS_Courthouse Square
>
Financial- Precision Industrial
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 3:30:32 PM
Creation date
9/6/2011 3:56:55 PM
Metadata
Fields
Template:
Building
RecordID
10218
Title
Financial- Precision Industrial
Company
Marion County
BLDG Date
10/9/1997
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. Will the county help in providing traffic control or wave parking fees for any phase for the <br />duration of this project7 <br />Because Marion County is a government body there aze no nermit fees. However, <br />construction/maintenance pazking permits, lane closure pemuts, and sidewalk closure permits ue <br />required and can be obtained at Salem City Ha11, Room 325. These permits must be specific as to <br />time and date, required signage, and other items as required. Refer to the Coudhouse Square <br />Project when you apply, indicate this is a Marion County project and no fees aze required. <br />7. Can equipment remain in the street or partially block the street for specific tasks during the <br />project? <br />The answer is yes, if your permit authorizes use of the streets in this manner. <br />8. Are there any reslrictions for trafCic cantrol when bringing in heavy equipment? Can the <br />contractor apply for street lane closure for specific tasks? How should they inquire? <br />Yes, see item #6 regarding how to obtain permits. <br />` 9:'° ' If contractors are held up by a delay in tenant evacuation, will the contract time line be <br />extended? <br />;: , <br />~~~: <br />10. Will Browns Island accept all demolition or asbestos waste and at what cost & schedule? <br />Browns Island Demolition L.andfill <br />2895 Fuagate St. S <br />Salem, Oregon <br />Phone Number: (503) 588-5169 <br />Browns Island Demolition Landfill summer hours aze 8:00 AM unti14:30 PM Monday through <br />Saturday. These hours will be in effect during abatement and demolition. For this project, if <br />volume is sufficient, Sunday and after hour disposal can be arranged. <br />Browns Island Demolition Landfill can accept only demolition material, including conc~ete and <br />asbestos waste, consistent with Marion County's DEQ permit for disposaL The DEQ permit limits <br />waste to inert materials with up to 10% contamination of wood and metal. The price is $5.00 per <br />cubic yazd for disposal of all materials including asbestos. Asbestos needs to be properly bagged <br />and hand unloaded. <br />The County reserves the right to direct the flow of demolition and asbestos waste. If the county <br />elects ro direct the waste to be disposed, the intention is to reduce the price of disposal. <br />The contractor will list a line item for a per ton or per cubic yazd cost for hauling and disposal. <br />The contractor will also show their preferred disposal site on the demolition proposal form in the <br />specification packet. <br />The Contractor must also list a per ton and per cubic yazd price for hauling such waste to the <br />Courthouse Square Projec[ <br />Amendment #1 2 <br />Mazch 24, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.