Laserfiche WebLink
SALEM COURTHOUSE SQUAkc~, INC. <br />DEMOLTI'ION <br />1997 <br />SECTION 00300 <br />RFP <br />PAGE 1 OF 2 <br />PROPOSAL - Package i <br />For Completion in 60 days <br />300 SALEM COURTHOUSE SQUARE, INC. <br />DEMOLITION <br />OF <br />ALL STRUCTURES BOUNDED BY COURT STREET, CHURCH STREET, <br />CHEMEKETA and HIGH STREET IN SAL~M, OREGON <br />1997 <br />301 The asbestos abatement must be coordinated by the demolition contractor to meet established dates of <br />completion. Having cazefully examined the Project specifications and conditions relating to the work, [he <br />undersigned agrees to enter inro a contract with Marion County to furnish all labor, materials and other <br />services required by, and in strict accordance with the plans and specifications for the following sum: <br />Base Proposal Amount: <br />For demolition of all structures bounded by Coud Street, Church S[reet, Chemeketa Street and High Street <br />in Salem, Oregon. This Proposal shall be a single fixed price. The demolition includes but is not <br />necessarily limited to the following: demolition of buildings, concrete slabs, asphalt and paving, <br />foundations to subgrade and salvage of required components. The Proposal shall include lateral force <br />resisting stcuctural components to shore the subgrade basement wall to the floors that aze to remain. <br />Dollazs Cents $ <br />a. List your disposal costs. Break them out per the following: <br />Cost per cubic yazd for trucking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : : ~ <br />Costpertonfortrucking .................................. <br />Cost per cubic yard for disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ <br />Cost per ton for disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ <br />b. Name and location of disposal site: <br />c. Cost per cubic yazd for trucking to Browns Island Demolition Landfill ....$ <br />Cost per ton for trucking to Browns Island Demolition Landfill .........$ <br />d. Amount included in lump sum proposal for disposal and hauling <br />of waste to disposal site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ <br />e. Estimated value of salvage/recyclable materials which have been credited toward <br />the project price . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ <br />f. Cost to remove curbs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ <br />*Please attach itemized listing of materials and their value. <br />302 The name of Surety to be used for Performance & Payment bonding is: <br />303 <br />Firm Name <br />Street Address <br />City State Zip <br />State LicenselRegistration <br />( ) <br />Date Phone No. <br />Representative <br />Title of Representative <br />Signature <br />Cour~house Square Project <br />Amendment #1 <br />Mazch 24, 1997 ~ <br />