My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Report
>
CS_Courthouse Square
>
Demolition Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:43:32 PM
Creation date
9/8/2011 9:20:27 AM
Metadata
Fields
Template:
Building
RecordID
10334
Title
Demolition Report
Company
Century West
BLDG Date
6/5/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5.4 Hazardous Materials Removal <br />No hazardous materials were reported or observed by Staton Construction personnel during <br />demolition. <br />6.0 CONTRACTOR AND SUBCONTRACTOR REVIEW <br />Century West reviewed contractor and subcontractor performance including adherence to the <br />demolition schedule. Century West provided status reports as necessary to Marion County <br />personnel. <br />6.1 Contractor/Subcontractor Performance <br />Daily and weekly meetings were held to review contractor and subcontractor performance <br />throughout the project. Staton Construction performed all work in a satisfactory manner. One <br />exception in the work was noted and remedied regarding sewer lateral abandonment. <br />6.2 Schedule Adherence <br />Schedule reviews occurred on a weekly basis during the demolition process. The schedule was <br />adhered to by Staton Construction in a satisfactory manner throughout the project. <br />Beri Building <br />The Beri Building was demolished during the week of June 15, 1997. Staton Construction <br />salvaged many of the bricks from the Beri Building and stockpiled them onsite for subsequent <br />salvage by the public. Staton Construction also removed three large timbers from the building for <br />salvage sale. Two of the timbers were in good condition while the third was deteriorated. <br />Lui Building <br />The Lui Building was demolished during the week of June 22, 1997. <br />Goldberg Building <br />The Goldberg Building was demolished during the weeks of June 22 and June 29, 1997. <br />(Appendix G: Site Photographs, photo 9.) <br />Goodman Building <br />The Goodman Building was demolished during the weeks of June 22 and June 29, 1997 <br />(Appendix G: Site Photographs, photos 10-12.) <br />Demolition Management Pagc R C~~'F.C 6/4,~98 <br />Courthouse Square Project 40806-001-22 <br />Marion County <br />
The URL can be used to link to this page
Your browser does not support the video tag.