My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Report
>
CS_Courthouse Square
>
Demolition Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:43:32 PM
Creation date
9/8/2011 9:20:27 AM
Metadata
Fields
Template:
Building
RecordID
10334
Title
Demolition Report
Company
Century West
BLDG Date
6/5/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9701 Site Survey and Remediation
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Marion County required Staton Construction to recycle 90% of all demolition debris generated <br />on-site. Demolition was conducted in such a way to ensure that the recyclable and salvageable <br />constituents of the waste stream were easily recoverable. Marion County required Staton <br />Construction to work with Marion County Solid Waste to develop a Recovery and Waste <br />Management Plan to assure that the handling of materials generated, separated, stored and taken <br />to markets, adequately addressed the 90% recycling goal. Additionally, Staton Construction's <br />original Work Plan designated areas for working space, recycling containers, waste containers, <br />materials and salvage storage, and routes of access to the areas within buildings where demolition <br />was occurring. <br />Debris, including masonry, concrete, metals, and similar materials were to become the property of <br />Staton Construction and be disposed of off site by Staton Construction. Staton Construction <br />submitted a recycling and resource recovery plan outlining materials to be recovered. Staton <br />Construction stored salvaged, recyclable and reusable materials in such a way that they were not <br />contaminated. <br />Staton Construction provided copies of records and receipts showing the type, weight, and <br />quantity of materials recycled, salvaged and reutiliaed and the entity that received the material. <br />Staton Construction trucked demolition recyclable debris to a number of facilities including wood <br />waste recyclers, concrete recyclers, and metal recyclers. At the completion of demolition <br />activities, 91% of demolition debris generated during the project had been recycled, sold as <br />salvage, or reused. <br />Concrete, steel, wood, drywall, and insulation mixed wastes from the Senator Building proved <br />too difficult to sort on-site for recycling. Consequently, a majority of the debris generated while <br />demolishing the concrete and steel section of the Senator Building were disposed of at Brown's <br />Island Landfill. <br />The table below details the quantity and types of debris that were recycled or disposed of during <br />the project (Appendix K, Recycling Data). <br />Material Quantity (tons) <br />Asphalt and Concrete 11,633.80 <br />Wood 1,709.28 <br />Bricks 661.25 <br />Metals 589.74 <br />Miscellaneous Recycled 56.00 <br />Total Recycled 14,650.07 <br />Landfilled Material 1,333.75 <br />Demolition Management Page 10 C\~~EC G/4; 98 <br />Courthouse Square Project 40806-001-22 <br />Marion County <br />
The URL can be used to link to this page
Your browser does not support the video tag.